<?xml version="1.0" encoding="iso-8859-1"?>
<rss version="2.0" xmlns:georss="http://www.georss.org/georss"><channel>
<title>NCPR Topical RSS: general-electric</title>
<link>http://www.northcountrypublicradio.org</link>
<description>Latest North Country Public Radio regional news by topic. Topic=general-electric.</description>
<language>en-us</language>
<copyright>&#x2117; &amp; &#xA9; 2013, North Country Public Radio</copyright>
<docs>http://blogs.law.harvard.edu/tech/rss</docs>
<ttl>60</ttl>
<managingEditor>radio@ncpr.org</managingEditor>
<webMaster>radio@ncpr.org</webMaster>

<image>
<title>North Country Public Radio Newsroom</title>
<url>http://www.northcountrypublicradio.org/images/ncprorgsm.gif</url>
<link>http://www.northcountrypublicradio.org</link>
<width>51</width>
<height>12</height>
<description>NCPR provides locally-produced news stories from around the Adirondack and North Country regions of New York State, as well as Western Vermont, and Ontario and Quebec in Canada.</description>
</image>
<item>
<title>President delivers optimism at GE</title>
<link>http://www.northcountrypublicradio.org/news/story/17035/20110124/president-delivers-optimism-at-ge</link>
<description><![CDATA[ (Jan 24, 2011) President Obama touched down in upstate New York Friday for a  brief visit to General Electric&apos;s energy operations in Schenectady. As the Innovation Trail&apos;s Emma Jacobs reports, his visit left many in the region feeling optimistic. [<strong><a href="http://www.northcountrypublicradio.org/news/story/17035/20110124/president-delivers-optimism-at-ge">full story</a></strong>]]]></description>
<pubDate>Mon, 24 Jan 2011 00:00:00 -0500</pubDate>
<enclosure url="http://www.northcountrypublicradio.org/news/images/obamaatGE.jpg" length="27817" type="image/jpeg"/>
<georss:point>42.8142432 -73.9395687</georss:point></item>

<item>
<title>Hudson River dredging: making it better, or worse?</title>
<link>http://www.northcountrypublicradio.org/news/story/13622/20090529/hudson-river-dredging-making-it-better-or-worse</link>
<description><![CDATA[ (May 29, 2009) Four hundred years after Henry Hudson sailed up the river that bears his name, one of the biggest toxic waste cleanups ever is underway. It&apos;s an attempt to restore the Hudson to health. Environmentalists fought more than 30 years for the cleanup, but not everyone’s on board. As part of a collaboration with Northeast stations, David Chanatry reports. [<strong><a href="http://www.northcountrypublicradio.org/news/story/13622/20090529/hudson-river-dredging-making-it-better-or-worse">full story</a></strong>]]]></description>
<pubDate>Fri, 29 May 2009 00:00:00 -0400</pubDate>
<enclosure url="http://www.northcountrypublicradio.org/news/images/hudsonb090529.jpg" length="17176" type="image/jpeg"/>
<enclosure url="http://www.northcountrypublicradio.org/news/images/hudsona090529.jpg" length="19361" type="image/jpeg"/>
<georss:point>43.2665190 -73.5844290</georss:point></item>

<item>
<title>Dredging begins on Upper Hudson after decades of PCB debate</title>
<link>http://www.northcountrypublicradio.org/news/story/13558/20090518/dredging-begins-on-upper-hudson-after-decades-of-pcb-debate</link>
<description><![CDATA[ (May 18, 2009) After decades of research, litigation and political wrangling, General Electric is finally dredging tons of PCB-contaminated muck from the upper Hudson River.  The first scoop was pulled from the river Friday morning.  It&apos;s expected to be one of the biggest and most challenging environmental clean-ups in US history.  This morning, Brian Mann has a special in-depth look at the battle over the future of the Hudson River. [<strong><a href="http://www.northcountrypublicradio.org/news/story/13558/20090518/dredging-begins-on-upper-hudson-after-decades-of-pcb-debate">full story</a></strong>]]]></description>
<pubDate>Mon, 18 May 2009 00:00:00 -0400</pubDate>
<enclosure url="http://www.northcountrypublicradio.org/news/images/epa1.jpg" length="62327" type="image/jpeg"/>
<enclosure url="http://www.northcountrypublicradio.org/news/images/epa2.jpg" length="52477" type="image/jpeg"/>
<georss:point>43.2565190 -73.5844290</georss:point></item>

<item>
<title>GE Reveals Spending on PCB Dredging Fight</title>
<link>http://www.northcountrypublicradio.org/news/story/6735/20060111/ge-reveals-spending-on-pcb-dredging-fight</link>
<description><![CDATA[ (Jan 11, 2006) A group of religious investors led by a Roman Catholic nun says General Electric spent more than $120 million trying to block the clean up of toxic PCBs.  GE disclosed the figures after years of pressure from activist shareholders. As Brian Mann reports, critics say the money should have been spent cleaning up the Hudson River and other polluted sites. [<strong><a href="http://www.northcountrypublicradio.org/news/story/6735/20060111/ge-reveals-spending-on-pcb-dredging-fight">full story</a></strong>]]]></description>
<pubDate>Wed, 11 Jan 2006 00:00:00 -0500</pubDate>
<enclosure url="http://www.northcountrypublicradio.org/news/images/ge.jpg" length="13527" type="image/jpeg"/>
<georss:point>44.5969200 -75.1733850</georss:point></item>

<item>
<title>GE, EPA Announce Hudson River Dredging Deal</title>
<link>http://www.northcountrypublicradio.org/news/story/6280/20051007/ge-epa-announce-hudson-river-dredging-deal</link>
<description><![CDATA[ (Oct 7, 2005) The US Environmental Protection Agency and General Electric have struck a deal on dredging PCB-contaminated sediment from the bottom of the upper Hudson River.  Martha Foley reports. [<strong><a href="http://www.northcountrypublicradio.org/news/story/6280/20051007/ge-epa-announce-hudson-river-dredging-deal">full story</a></strong>]]]></description>
<pubDate>Fri, 07 Oct 2005 00:00:00 -0400</pubDate>
<georss:point>44.5969200 -75.1733850</georss:point></item>

<item>
<title>GE To Pay New Yorkers For Deceptive Practices</title>
<link>http://www.northcountrypublicradio.org/news/story/3219/20030806/ge-to-pay-new-yorkers-for-deceptive-practices</link>
<description><![CDATA[ (Aug 6, 2003) General Electric will pay New York consumers $780,000 as well as a $650,000 penalty under a court order as a part of a state lawsuit claiming deceptive practices. Jody Tosti has more. [<strong><a href="http://www.northcountrypublicradio.org/news/story/3219/20030806/ge-to-pay-new-yorkers-for-deceptive-practices">full story</a></strong>]]]></description>
<pubDate>Wed, 06 Aug 2003 00:00:00 -0400</pubDate>
<georss:point>44.5969200 -75.1733850</georss:point></item>

<item>
<title>GE Strike Looms In Fort Edward</title>
<link>http://www.northcountrypublicradio.org/news/story/2262/20030108/ge-strike-looms-in-fort-edward</link>
<description><![CDATA[ (Jan 8, 2003) General Electric’s factories in Fort Edward and Schenectady are facing their first national strike in more than thirty years.  GE’s largest unions – representing some twenty thousand workers – say they’ll stage a two-day protest next week.  As Brian Mann reports, local businesses worry that a longer dispute could follow. [<strong><a href="http://www.northcountrypublicradio.org/news/story/2262/20030108/ge-strike-looms-in-fort-edward">full story</a></strong>]]]></description>
<pubDate>Wed, 08 Jan 2003 00:00:00 -0500</pubDate>
<georss:point>44.5969200 -75.1733850</georss:point></item>

<item>
<title>EPA, GE May Work Together On Hudson Clean-up</title>
<link>http://www.northcountrypublicradio.org/news/story/602/20020410/epa-ge-may-work-together-on-hudson-clean-up</link>
<description><![CDATA[ (Apr 10, 2002) After years of bitter fighting, General Electric and the Environmental Protection Agency are moving ahead with plans to dredge the Hudson River.  GE is giving signs that it may work with the EPA - instead of filing legal action to block the clean-up.  Federal officials are also offering compromise.  Brian Mann has this update. [<strong><a href="http://www.northcountrypublicradio.org/news/story/602/20020410/epa-ge-may-work-together-on-hudson-clean-up">full story</a></strong>]]]></description>
<pubDate>Wed, 10 Apr 2002 00:00:00 -0400</pubDate>
<georss:point>44.5969200 -75.1733850</georss:point></item>

<item>
<title>EPA Staff Meets with Environmental Groups on Hudson River PCB Cleanup</title>
<link>http://www.northcountrypublicradio.org/news/story/1561/20011004/epa-staff-meets-with-environmental-groups-on-hudson-river-pcb-cleanup</link>
<description><![CDATA[ (Oct 4, 2001) Environmental groups met Tuesday with top staff at the EPA to discuss a clean-up of the Hudson River. The talks follow earlier closed-door sessions between the agency and GE. As Brian Mann reports, clean up supporters worry that the project could be derailed. [<strong><a href="http://www.northcountrypublicradio.org/news/story/1561/20011004/epa-staff-meets-with-environmental-groups-on-hudson-river-pcb-cleanup">full story</a></strong>]]]></description>
<pubDate>Thu, 04 Oct 2001 00:00:00 -0400</pubDate>
<georss:point>44.5969200 -75.1733850</georss:point></item>

<item>
<title>America&apos;s Largest Superfund Site: The Hudson River, Part 3</title>
<link>http://www.northcountrypublicradio.org/news/story/550/20010502/america-apos-s-largest-superfund-site-the-hudson-river-part-3</link>
<description><![CDATA[ (May 2, 2001) In the final part of our series on PCB contamination in the Hudson River, Brian Mann looks at the damage to the environment...and at GE&apos;s claim that the river is slowly cleaning itself. [<strong><a href="http://www.northcountrypublicradio.org/news/story/550/20010502/america-apos-s-largest-superfund-site-the-hudson-river-part-3">full story</a></strong>]]]></description>
<pubDate>Wed, 02 May 2001 00:00:00 -0400</pubDate>
<georss:point>44.5969200 -75.1733850</georss:point></item>


</channel>
</rss>
